STAGE TWO Update

Showers are forecast this week but that shouldn’t interfere with the program for Stage 2. During the week, the main activity has been setting out and pouring the panels which will become the walls of the auditorium. There are 15 panels with already 9 poured, sitting on the ground in three stacks separated by only a film of non-stick spray. The walls will be 175mm thick so they are quite solid. The week after, a crane will lift and position them and the structural steel will follow. We have 2 weeks before the builders will need to remove part of the existing wall. That will be on March 13.

Until then keep praying that all will continue to go well.